
The contractor installs drip systems with acid and fertiliser dosing. Brass fittings were pitting within two seasons, and every callout cost more than the part.
Two seasons in, the callout rate on fittings has dropped to zero and the fitting standard is now written into the contractor installation manual.
Phone: +86 13389005959
Email: info@vodarengineering.com
Add: No.7 Liaoning Road Tianjin Ziya Circular Economy Industrial Zone, China
We chat